Building Construction – SS1, SS2 & SS3 Curriculum; Scheme of Work; Assessment Tests

Hello and welcome!

ASSURE Educational Services has put-together the scheme of work on Building Construction  – SS1, SS2 and SS3 based on the National Curriculum and the syllabus of WAEC and NECO. All the topics highlighted in the National Curriculum and the syllabus of WAEC and NECO have been accommodated in our Scheme of Work.

End of term Assessment Tests in SS1, SS2 and SS3 alongside Overall Assessment Tests are available. Schools may adopt our scheme of work because of its simplicity and ease of monitoring of academic activities.

The Scheme of Work stated below is inexhaustible. Schools are encouraged to input weeks and periods of completion of topics in accordance with the academic calendar, number of students and available classes.

SS1 Building Construction – 1st Term Scheme of Work

Class Term Main Topics Contents
SS1 1st Term Introduction to Building (i)     Definition of building
(ii)    Classification and types
(iii)    Introduction to National Building Codes. (Building regulations and Byelaw requirements)
Building Construction and Construction Team (i) Definition, purpose and procedures for building construction
(ii) Parties in the construction team. (Client’s team, contractor’s team and statutory personnel.
(iii) Function of the team members.
(iv) Relationship of the parties.
Safety Practices. (i) Definition of safety, rules and regulation.
(ii) Hazards in the workshop and construction site.
(iii) Causes and method of accident prevention.
(iv) Safety equipment and measures at construction site.
(v) First aid equipment, procedures and safety wears.
(vi) Safety in working with dangerous equipment and materials (electricity, scaffolding, formwork, cement, roof, etc).





SS1 Building Construction – 2nd Term Scheme of Work

Class Term Main Topics Contents
SS1 2nd Term Basic tools, equipment and machines (i) Identification and functions of basic.
(ii) Tools and equipment.
(iii) Care of tools and equipment.
Site clearing and levelling (i) Operations involved in site clearing.
(ii) Tools and equipment for site clearing and levelling.
(iii) Basic site levelling operations.
Site organization and layout (i) Preliminary operations in building construction.
(ii) Procedure for site layout.
(iii) Location, boundary lines, hoarding, hutments and access road.



SS1 Building Construction – 3rd Term Scheme of Work

Class Term Main Topics Contents
SS1 3rd Term Setting out (i) Methods of setting-out. (3:4:5 method, Builders’ square method).
(ii) Tools and equipment for setting out.
(iii) Procedures for setting out.
Building Drawing (i) Use of drawing tools and simple exercise on plane geometry in relation to building.
(ii) Building drawing symbols
(iii) Scales used in building and their application on site.
(iv) Production drawings and interpretations (Plans, Elevations, sections and details).
(v) Special details (Detailing building elements including doors and windows schedule).
(vi) Scaling (Enlargement, pictorial and perspectives.
(vii) Definitions and use of Auto-CADD.
Excavation and earth-work. (i) Classifications, types and properties of soil.
(ii) Definition and function of excavation.
(iii) Methods of excavations.
(iv) Tools, equipment and plant used for excavation.
(v) Solution to excavation problems (Earthwork support, timbering battering and dewatering).
(vi) Safety rules during excavations.





SS2 Building Construction – 1st Term Scheme of Work

Class Term Main Topics Contents
SS2 1st Term Foundation (i) Definition, purpose and functional requirement of foundation.
(ii) Types of foundation.
(iii) Factors that determine choice of foundation.
Ground Floors (i) Types, functions and functional requirement of ground floor.
(ii) Methods of construction ground floor.
(iii) Definition of basement.
(iv) Explain differences between building with basement and without basement.
(v) Problems relating basement in a building.
Suspended floors (i) Definition and functions of upper floor
(ii) Methods of construction concrete floors and timber upper floors.



SS2 Building Construction – 2nd Term Scheme of Work

Class Term Main Topics Contents
SS2 2nd Term Concrete (i) Definition and types of concrete.
(ii) Materials for concrete.
(iii) Definitions types, components and manufacture of cement. Properties and uses of cement including other alternatives to cement product e.g. Pozzolana, Pulverize fuel Ash (P.F.A.), Rice husk ash (R.H.A), etc
(iv) Types and uses of aggregates (other aggregates such as palm kernel shell) and periwinkle, etc.
(v) Types and uses of reinforcements.
(vi) Properties and characteristic of concrete
(vii) Process of concrete production.
(viii) Types of concrete tests.
Walls (i) Definition, types and functions of walls
(ii) Definition, types and properties of walling materials. (including locally sourced materials).
(iii) Manufacturing processes of walling materials (clay, brick, blocks and concrete blocks).
(iv) Sizes of blocks and bricks.
(v) Mortar mixes for brick.
(vi) Methods of wall construction
(vii) Timber wall construction.
(viii) Definition and function of wall openings.
(ix) Methods of constructing wall opening.
(x) Functions of lintels and arches.
Doors and windows (i) Definition, functions and types of doors and windows.
(ii) Methods of mixing doors and window frames
Staircases (i) Definition, classification, types and uses of stairs.
(ii) Materials used for construction of stairs.
(iii) Materials used for finishing staircases.
Plumbing installations and drainage system. (i) Types of fitting in plumbing and sanitary works.
(ii) Materials for plumbing works and fittings.
(iii) Types of sanitary appliances.
(iv) Soil and waste appliances.
(v) Installation of sanitary appliances.
(vi) Terms used in drainage works.
(vii) Principles and functional requirement of drainage system.
(viii) Types of drainage system.
(ix) Types of drainage materials (pipes and fittings).
(x) Methods of laying and testing drain lines.
(xi) Description of septic and soakaway (inspection chamber, manhole, etc).





SS2 Building Construction – 3rd Term Scheme of Work

Class Term Main Topics Contents
SS2 3rd Term Electrical installation and solar energy system (i) Electrical symbols, installation terms and materials.
(ii) Identification and uses of electrical wiring materials.
(iii) Types of electrical wiring.
(iv) Definition, functions and components of solar energy systems.
Roofs (i) Definition, purpose and types of roof.
(ii) Functional requirements of roof.
(iii) Materials used for roofs.
(iv) Roof covering materials.
(v) Protection of roof from wind, rain, lightening, etc.
Finishes (A) Floors:
(i) Types and characteristics of floor finishes.
(ii) Methods of laying floor finishes.
(iii) Uses of floor finishes.
(iv) Care and maintenance of floor finishes.(B) Walls
(i) Types and characteristics of wall finishes
(ii) Plastering and rendering
(iii) Types of rendering
(iv) Methods of applying plastering and rendering mix.

(C) Ceiling:
(i) Types and function of ceiling finishes.
(ii) Ceiling finishing materials.

External Work (i) Types of fence, materials for fencing and construction of fence.
(ii) Types of gate, fixing of gates and production of gate.
(iii) Types and materials for construction of access roads.
(iv) Construction of access road.
(v) Needs and materials for landscaping.
(vi) Procedures for landscaping.



SS3 Building Construction – 1st Term Scheme of Work

Class Term Main Topics Contents
SS3 1st Term Types of Business Organization and Ways of Raising Capital. (i) Principles and Management of Business Organization in the building industry.
(ii) Types of Business Organization in the Building Industry.
(iii) Types and sources of Capital.
Book Keeping (i) Book Keeping in small scale businesses.
(ii) Books of original entries.
Contract Work (i) Definition and types of contract.
(ii) Contract documents.
(iii) Parties to a contract.

SS3 Building Construction – 2nd Term Scheme of Work (Revision/Building Drawing)